Language:

Professional manufacturer and sales team promise a satisfying cooperation.

Enter keywords to search products

Email: sales@hlcables.com   Service Hotline:+86-371-6676-6667

HOT PRODUCT

  • 600/500V Airport Ligting Cable
    Mobile Concrete Mixing Plant1. Voltage: 600/5000 Voltage; 2. Conductor: Copper; 3.Shield: Cross-linked Polyethlene(XLPE)-5kv; 4Insulated: Cross-linked Polyethlen...
  • MV Aerial bundle cable
    Mobile Concrete Mixing Plant1.Voltage:10kv 33kv,2.support conductor:galvanized steel wire messenger

CONTACT US

  • Tel: +86-371-6676-6667
  • E-mail: sales@hlcables.com
  • Fax:+86-371-8751-3085
  • Msn: WhatsApp:8615093102503

News & Events

YSLY EB YSLCY PVC Control Cable PVC Outer Sheath 300/500V flame retardant copper control cable

Information Source:Huadong Cable Group-Zhengzhou Hongliang Cable Co., Ltd24 fiber  Release date:28/04/2018

 Application:

Flexible power, process control and instrumentation cable for industry and machinery environment with increased requirements to electromagnetic compatlbility in indoor applications. For installation in dry and damp rooms. The cable is resistant against most usual chemicals, oil and grease.
Additional information:
Note: Please check also the UV-resistant version CY-JZ 600.
 Packaging & Shipping
YSLY EB YSLCY PVC Control Cable PVC Outer Sheath 300/500V flame retardant  copper control cable.
1) 100 to 1,000m reeled in carton drum or according to customers' requirement.
2) Outer packing: wooden case, carton box.
3) Other packing requirement according to client's request.
Our Services
YSLY EB YSLCY PVC Control Cable PVC Outer Sheath 300/500V flame retardant  copper control cable.
1. We guarantee to offer new advanced goods.
2. We'd like to send skilled personnel to the installing place to help offer technical consultant, quantity estimation and instruction,installing, preliminary testing,and help start up running; and to answer for any defect of the product found in installing and run testing, If there's something wrong with the product, we'll give our answer within 12 hours and get to the spot within 36 hours.
3.After installaton, We'll send skilled personnel to have the preliminary test and answer for any problems emerged. We take the whole charge of the fee needed in repairing,testing or retesting within the scope of our duty required in contract.
4.During the contract's period of validity,of the project must be started all over again or the goods can not be used at all which is resulted from our faulty goods and improper files or mistakes made by our instructors, we'll change the goods at once without compensation and take charge in all expenses of reinstallation.

Previous | 600V two conductor SEU Concentric cable AA8000 Aluminum c... Next | 1-19pairs 300/500V XLPE insulated instrumentation cable

Related Information: